The UK is one of the best locations for wind power in the world, and is considered to be the best in Europe.
The permanent elements of a wind farm comprise: turbines, transformers, substation and site entrance/access tracks.
Bailey Partnership
scope for each project varies and may involve the design of one, or more, of the following:
- Turbine foundations
- Site entrance
- Access tracks
- Off-site temporary highway works
- Contractor’s compound
- Crane hardstandings
- Substation building
- Transformer foundations
- Surface water drainage
Foundations are generally reinforced concrete gravity (ground supported) bases, although piles are sometimes required
The design criteria for access tracks and hardstandings require adequate construction to support both the temporary condition of construction traffic, and vehicle movements during operation of the wind farm.
Any existing access tracks are likely to require widening and possible local strengthening to accommodate the larger vehicles and cranes associated with the turbines.
Bailey Partnerships are actively involved in providing civil and structural engineering design services for wind farms.We work closely with landowners, developers, project managers, contractors, and turbine manufacturers in the development of onshore wind farms throughout the UK.
Bailey Partnership have extensive experience in the design and detailing of wind turbine foundations together with wind farm tracks, crane platforms, piling platforms, and substation/switchgear buildings and substructures. Our experience allows us to undertake independent third-party reviews of turbine foundations designed by other consultants.